From field data to NCEC approval
Environmental consultants licensed by NCEC. Based in Al Khobar, on site wherever you build.
Request a proposal How NCEC permits workLicences and approvals
- NCEC Type A
- Licence ELESL-2025-000073
- ISO certified
- ISO 9001, 14001 and 45001
- Royal Commission
- Approved for EIA, groundwater and noise studies in Jubail and Yanbu
- 200+ projects
- Delivered by our team across Saudi Arabia
Three practices. One standard.
NCEC permits lead our work. Around them sit the studies those permits rely on, and the sustainability work clients need for certification and reporting.
NCEC permits and complianceClassification to the permit to operate, construction compliance, closure, and Royal Commission EPC and EPO.
Environmental studiesBaseline, ecology and marine surveys, monitoring, soil and groundwater testing, hygiene and modelling, by our own field teams.
SustainabilityLife cycle assessment, EPD and HPD, LEED, ESG strategy, net zero and sustainability reporting.
Clients we have worked with
How a project gets its permit
The same four steps on every project, from the first site visit to the permit.
-
1
Field
Our own teams survey the site: air, noise, water, soil and ecology. Every point is located, photographed and logged.
Our teams survey air, noise, water, soil and ecology on site.
-
2
Data
Samples are analysed to recognised methods and checked against the NCEC standard for each environmental medium.
Samples are analysed and checked against NCEC standards.
-
3
Study
We write the study your category needs: an EMP, an EIA, or a scoping report and then an EIA.
We write the EMP, EIA or scoping report your category needs.
-
4
Approval
We manage the submission and answer NCEC’s comments. A Category 2 EIA is decided within 30 working days, a Category 3 EIA within 60.Executive Regulations for Environmental Permits, Art. 7(4)(b) and Art. 8, Second (2)(b)
We manage the submission until NCEC decides.
Industries we work in
Each sector meets NCEC at different points. These are the permits and studies we prepare most often for each.
Power and utilitiesPermit to establish, stack testing, audit studies
Construction and real estateCESMP, dewatering permits, dust and noise monitoring
Oil, gas and petrochemicalsCategory 3 EIA, emergency plans, permits to operate
Marine and coastalMarine licences, baseline surveys, mixing zone modelling
Industrial and manufacturingPermits to operate, industrial hygiene, waste plans
Every rule, referenced
Our library is written from the official regulation texts. It holds 43 guides, 130 regulatory deadlines, 131 fines and 99 defined terms, each with the article it comes from. It is free to use.
In Jubail, Yanbu, Ras Al-Khair or Jazan? The Royal Commission library covers RCER-2025, with a forms checker and a deadline calculator.
Begin with the ground. We will take it from there.
Send us the location and what you plan to build. We will set the likely NCEC category and the path to your permit.