Search the site

Press Esc to close

A boat moving along a channel through mangroves, seen from above

From field data to NCEC approval

Environmental consultants licensed by NCEC. Based in Al Khobar, on site wherever you build.

Request a proposal How NCEC permits work

Licences and approvals

NCEC Type A
Licence ELESL-2025-000073
ISO certified
ISO 9001, 14001 and 45001
Royal Commission
Approved for EIA, groundwater and noise studies in Jubail and Yanbu
200+ projects
Delivered by our team across Saudi Arabia

Three practices. One standard.

NCEC permits lead our work. Around them sit the studies those permits rely on, and the sustainability work clients need for certification and reporting.

Clients we have worked with

  • Red Sea Global
  • Jacobs
  • Nesma United Industries
  • Fugro
  • L&T
  • Engie
  • Energy China
  • UrbaCon Trading & Contracting
  • Doosan
  • KEPCO
  • Al Shalawi
  • NOV
  • Shapoorji Pallonji
  • Coastline
  • SAMA

How a project gets its permit

The same four steps on every project, from the first site visit to the permit.

  1. 1

    Field

    Our own teams survey the site: air, noise, water, soil and ecology. Every point is located, photographed and logged.

    Our teams survey air, noise, water, soil and ecology on site.

  2. 2

    Data

    Samples are analysed to recognised methods and checked against the NCEC standard for each environmental medium.

    Samples are analysed and checked against NCEC standards.

  3. 3

    Study

    We write the study your category needs: an EMP, an EIA, or a scoping report and then an EIA.

    We write the EMP, EIA or scoping report your category needs.

  4. 4

    Approval

    We manage the submission and answer NCEC’s comments. A Category 2 EIA is decided within 30 working days, a Category 3 EIA within 60.Executive Regulations for Environmental Permits, Art. 7(4)(b) and Art. 8, Second (2)(b)

    We manage the submission until NCEC decides.

Industries we work in

Each sector meets NCEC at different points. These are the permits and studies we prepare most often for each.

Begin with the ground. We will take it from there.

Send us the location and what you plan to build. We will set the likely NCEC category and the path to your permit.